Skip to content
Akros Mimarlık
TR

Trade fair

interzum exhibition stands

The Cemer Kent Ekipmanları stand: a spherical climbing unit set on sand, a world-map brand wall behind it and meeting tables in front.

A Turkish fittings, surface or panel manufacturer at interzum wants the product to be opened, closed and touched on the stand; nobody buys a hinge from a catalogue. So we build the sample wall in working order: the hinge on a door, the runner in a drawer, the surface on a real cabinet carcass. The stand is produced in our workshop in Beylikdüzü, sent to Cologne by lorry under an ATA Carnet with customs handled by us, and built at Koelnmesse by our own crew.

What we do for you at interzum

The fair takes place at Koelnmesse, which has 11 halls and 284,000 square metres of covered space. Our Aachen office is close to Cologne; the German-language correspondence with the hall management, the crew access and the on-site support are run from there. The technical file, the electricity and rigging applications, the graphics and the print are ours; freight is part of our exhibition logistics service.

On a furniture components stand the surface colour and the feel under the hand make the sale. We show surface and panel samples in large format under lighting close to daylight and check it with your samples in the lighting test at the workshop. For fittings we produce the working cabinet carcasses that visitors will open and close a thousand times; you fit your product into them, or we fit it following your assembly guide.

Stands we have built at this fair and in Cologne

Our interzum project is not yet published on the site. In the same halls we work at imm cologne and ORGATEC; our freight and build routine for Cologne comes from there. In Turkey we build stands for the Istanbul Furniture Fair and, on the fittings side, for Intermob, and our furniture industry page lists the work.

Which stand type

  • Custom timber build: 20 to 500 square metres, built in 2–5 days. At a furniture fair the stand itself shows what the product is; for uninterrupted surfaces and walls clad in your own panel this is the route.
  • Maxima system: 12 to 200 square metres, built in 1–3 days. Our choice for stands going by lorry on a tight calendar.
  • Island and corner stands: from 36 square metres, with the working carcasses on the open sides and the meeting room in the middle.

Timeline

interzum runs from 11 to 14 May 2027. Because we set aside a week for freight, the calendar moves forward: the brief, the 3D visual and the budget on 16 March; design approval and the technical file to Cologne on 30 March; workshop production and print files on 13 April; the trial assembly, lighting test and loading of the lorry on 4 May. Build in the hall during fair week, the handover walk on 10 May and dismantling on the evening of 14 May. Put your floor area and the product groups you plan to show into the quote form; we reply within 48 hours.

interzum 2027: 11–14 May 2027, Koelnmesse, Cologne. 34 weeks to go. Official fair site

Preparation timeline

  1. 16 March 20278 weeks before

    Brief, floor plan and three-dimensional design visual

  2. 30 March 20276 weeks before

    Design approval, technical file submitted to the organiser

  3. 13 April 20274 weeks before

    Production in the workshop; graphics and print files

  4. 4 May 20271 weeks before

    Trial assembly in the workshop, dispatch, ATA Carnet for abroad

  5. 11 May 2027Fair week

    Hall build, handover the day before opening, dismantling at close

Our stand types: size and on-site build time

We produce all of them in our own workshop. The size range and on-site build time come from our recorded projects; if you are undecided we draw two types for the same floor area and show them side by side.

  • Custom Timber Build
    Size
    20500
    Build
    2–5 days on site
    Projects
    13 published projects

    Purpose-built timber stand produced from scratch for each show.

  • Maxima System
    Size
    12200
    Build
    1–3 days on site
    Projects
    18 published projects

    Aluminium profile frame with clad panels; fast to install.

  • Modular
    Size
    9150
    Build
    1–2 days on site

    Component system built from aluminium profiles and panels; quick build and a small shipping volume.

  • Double Decker
    Size
    60600
    Build
    4–8 days on site

    Meeting space on the upper level; two floors on the same footprint.

  • Island and Corner
    Size
    36800
    Build
    3–6 days on site

    Open on all four sides; approachable from every direction.

  • Country Pavilion
    Size
    1002000
    Build
    4–10 days on site

    Shared area for many exhibitors with individual booths and one welcome desk.

Stands we have built

We have not published a project under this heading yet; these three stands from other fairs show the work of our workshop.

All projects

Frequently asked

When and where is interzum 2027?
interzum 2027 takes place 11–14 May 2027 at Koelnmesse (Cologne). Dates come from the organiser’s official site; this page is updated if they change.
When should a stand for interzum 2027 be ordered?
Starting by 16 March 2027 for a custom timber stand, or around 13 April 2027 for a maxima system stand, gives a comfortable schedule. For later starts we first tell you what can still be done.
What should we send for a quote?
The fair name and dates (filled in from this page), your floor area and number of open sides, plus a floor plan and reference images if you have them. The first concept and a written budget frame arrive within a few working days; the concept is free of charge.
Do you produce the working cabinet carcasses?
Yes, in our workshop. The carcass dimensions are drawn for your product, and if you wish we fit the hinges and runners following your assembly guide.
Who handles the freight and customs?
We do. The stand leaves under an ATA Carnet, travels to Cologne by lorry and returns to Turkey on the same carnet after the fair. The papers for your samples stay on your side, and we list together which document has to be ready when.
Who builds the stand in Germany?
Our own crew travelling from Turkey; with the Aachen office close to Cologne, on-site support is quick. The stand leaves the workshop after a trial assembly and test; a custom timber build takes 2–5 days in the hall. The day before opening we walk it together and hand it over with a written guarantee.
We want our surface colours to look right. How do you choose the lighting?
The sample wall gets lighting close to daylight colour temperature; warm light is used only in the seating corner. If you bring your samples to the trial assembly we adjust the lighting together.

Let us build your stand at interzum 2027

The link opens a quote form with the fair name and dates filled in; add your floor area and stand type and send it.

Request a quote

Other trade fairs