Skip to content
Akros Mimarlık
TR

Venue

Exhibition stands at Messezentrum Nürnberg

General view of the Ağaoğlu Silah stand at the fair 2025 in Nurumberg: a 60 sqm maxima system build.

A stand going to Nuremberg is finished in Istanbul; when we enter the hall we carry numbered parts, printed panels and a build plan. That is exactly how the 60 square metre maxima stand for Ağaoğlu Silah at IWA OutdoorClassics travelled. For a company exhibiting at Messezentrum Nürnberg we take on the freight, the ATA Carnet, customs and the correspondence with the hall management; you arrive with your products.

Building at Messezentrum Nürnberg: our experience

In 2025 we built a 60 square metre maxima stand for Ağaoğlu Silah at IWA OutdoorClassics. A stand showing firearms and hunting equipment needs lockable display cases, a solid wall fixing for the product and a counter where the visitor can handle it; on this kind of job we solve all of that inside the maxima grid, and the build is done by our own crew as everywhere else. Other stands in the firearms sector are listed on the industry page.

Hall rules, build and dismantling hours, height and rigging permits come from the organiser’s technical file, and because we know when that file closes at a German fair the calendar is planned around it. Our Aachen office gives local support on the German side. The fair calendar for the city and our working timeline are on the Nuremberg page.

Trade fairs at this venue

  • IWA OutdoorClassics, 4–7 March 2027. Hunting, shooting and outdoor; our Ağaoğlu Silah stand comes from this fair, and our lockable display solution for firearms stands applies here.
  • European Coatings Show, 27–29 April 2027. For coating raw materials the stand is built around sample shelving and meeting tables.
  • FACHPACK, 21–23 September 2027. For packaging producers we bring the experience of the stands we built at Eurasia Packaging to Germany; the work is listed on the packaging page.

Each fair page carries a preparation timeline counted back from the opening. Because freight and customs add time, for German fairs we suggest starting 8 weeks before the opening.

Which stand type

For work going to Nuremberg our first suggestion is the maxima system: aluminium profile grid and printed panels, used for plots from 12 to 200 square metres, built in the hall in 1–3 days. Companies that want an uninterrupted surface specific to their brand get a custom timber build, produced and trial-assembled in the workshop and shipped in sections; 2–5 days in the hall. For companies exhibiting inside a national participation we draw a pavilion stand that carries the shared identity and the company’s own at the same time. Put the fair name, floor area and number of open sides in the quote form; the first concept arrives free within 48 hours.

Related to this venue

For everything we do in this city, see the Nuremberg page.

Fairs held at this venue:

Our stand types: size and on-site build time

We produce all of them in our own workshop. The size range and on-site build time come from our recorded projects; if you are undecided we draw two types for the same floor area and show them side by side.

  • Custom Timber Build
    Size
    20500
    Build
    2–5 days on site
    Projects
    13 published projects

    Purpose-built timber stand produced from scratch for each show.

  • Maxima System
    Size
    12200
    Build
    1–3 days on site
    Projects
    18 published projects

    Aluminium profile frame with clad panels; fast to install.

  • Modular
    Size
    9150
    Build
    1–2 days on site

    Component system built from aluminium profiles and panels; quick build and a small shipping volume.

  • Double Decker
    Size
    60600
    Build
    4–8 days on site

    Meeting space on the upper level; two floors on the same footprint.

  • Island and Corner
    Size
    36800
    Build
    3–6 days on site

    Open on all four sides; approachable from every direction.

  • Country Pavilion
    Size
    1002000
    Build
    4–10 days on site

    Shared area for many exhibitors with individual booths and one welcome desk.

Projects 1

All projects

Frequently asked

Who handles freight and customs to Nuremberg?
We do. The stand leaves Turkey under ATA Carnet and returns on the same carnet after the fair. The item list is prepared in the workshop and the lorry is brought to the hall gate in the slot given by the hall management.
Who builds and dismantles the stand?
Our own crew travels from Istanbul, with local support from our Aachen office on the German side. On the closing evening we dismantle the stand as well; you collect your products and leave.
Can you display products that must stay under lock, such as firearms?
Yes. On firearms stands we solve lockable display cases and a solid wall fixing inside the maxima grid. The rules for bringing such products into the hall are followed from the organiser’s file, and the display cases and counter are drawn to those rules.
What should we send for a quote?
The fair name and dates, the floor area, the number of open sides and the organiser’s plot plan if you have it. Add a list of the products you will show and their weight and we draw the structure accordingly; the first concept is free of charge.

Other venues