Skip to content
Akros Mimarlık
TR

Industry

Pipes and Tubes trade fair stands

General view of the Mazlum Boru stand at the fair 2024 in Istanbul: a 36 sqm maxima system build.

On a pipe and tube stand the product takes up more room than anything else: six metre lengths of steel tube, stainless profiles, copper in coils. We draw the stand to carry that weight and that length. The tube rack sits on steel legs on the floor rather than hanging from a wall, and the cut sections go on a separate wall at eye level, because the buyer who stops at your stand wants to look at the wall thickness and the weld seam up close.

What we do for you at pipe and tube fairs

We draw the stand, produce it in our own workshop in Beylikdüzü, build it in the hall with our own crew and take it down when the fair closes. Getting your product into the hall is written into our build schedule: the long bundles go onto the stand by forklift on the first day and the walls and racks go up around them. The technical file for the hall management, graphics and print are ours; the product weight goes into that technical file. For Düsseldorf we run the freight, the ATA Carnet and customs, and our Aachen office gives local support on the German side.

Tube and profile ranges are wide and floor space is not, so we plan the sample wall section by section: a fixed slot for every diameter and wall thickness with the product code underneath. For stainless product we angle the light so the surface does not glare, and for heavy coils we draw a load-spreading platform.

Which pipe and tube fairs we work at

In Turkey, wire Eurasia runs 7–10 April 2027 at Tüyap; in 2024 we built the 36 square metre maxima stand for Mazlum Boru there. In Germany, wire & Tube Düsseldorf is on 3–7 April 2028 at Messe Düsseldorf, where we built the 25 square metre maxima stand for Saes in 2024. Stands we have built for the valve and metal processing producers who share these halls are on their own pages.

Which stand type for a tube stand

  • Maxima system: 12–200 square metres, 1–3 days to build in the hall. Both the Mazlum Boru and the Saes stands were maxima; in this system the tube rack and the printed panels bolt onto the aluminium grid.
  • Custom timber build: 20–500 square metres, 2–5 days in the hall. Our recommendation when a heavy coil platform, uninterrupted surfaces or non-standard dimensions are needed.
  • Island and corner stands: on a plot with two or three open sides we lay the long tube parallel to the aisle so visitors walk along it.

How we work

Send the fair name and dates, your floor area and the number of open sides; we come back within 48 hours. The first concept is free and comes as a three-dimensional visual; the written budget frame has three options with the scope listed item by item. Starting 8 weeks before the fair gives design approval at 6 weeks, workshop production at 4 weeks and a trial assembly in the workshop at 1 week. If you tell us the longest and heaviest item you want to show at the start, the structure is drawn around it. The quote form is here.

Upcoming pipes and tubes trade fairs

Full fair calendar

Dates come from the organisers’ official sites; past fairs drop off the list. The link on each row opens a quote form with the fair name and dates filled in.

April 2027

April 2028

Our stand types: size and on-site build time

We produce all of them in our own workshop. The size range and on-site build time come from our recorded projects; if you are undecided we draw two types for the same floor area and show them side by side.

  • Custom Timber Build
    Size
    20500
    Build
    2–5 days on site
    Projects
    13 published projects

    Purpose-built timber stand produced from scratch for each show.

  • Maxima System
    Size
    12200
    Build
    1–3 days on site
    Projects
    18 published projects

    Aluminium profile frame with clad panels; fast to install.

  • Modular
    Size
    9150
    Build
    1–2 days on site

    Component system built from aluminium profiles and panels; quick build and a small shipping volume.

  • Double Decker
    Size
    60600
    Build
    4–8 days on site

    Meeting space on the upper level; two floors on the same footprint.

  • Island and Corner
    Size
    36800
    Build
    3–6 days on site

    Open on all four sides; approachable from every direction.

  • Country Pavilion
    Size
    1002000
    Build
    4–10 days on site

    Shared area for many exhibitors with individual booths and one welcome desk.

Projects 1

All projects

Frequently asked

Can a six metre tube fit on the stand?
Yes. We place long tube parallel to the longest edge of the stand on a floor-standing steel rack, so nothing loads the wall. Give us the length and quantity at the quote stage.
Are heavy coils and bundles a floor load problem?
We pass the floor load to the hall management through the technical file and, where needed, draw a platform that spreads the load. All we need from you is the weight of the product.
How does the product get into the hall and who unloads it?
Product delivery is part of our build schedule; the entry slot is settled with the hall through the technical file. Your product is the first thing our crew puts on the stand.
Who handles freight and customs for Düsseldorf?
We do. The stand and your samples leave Beylikdüzü together, we run the ATA Carnet and the customs paperwork, and our Aachen office supports on the German side. The full sequence is on the international exhibition stand page.

Let us build your stand at your next pipes and tubes fair

Send the fair name, dates and your floor area; the first concept and a written budget frame arrive within a few working days. The concept is free of charge.

Request a quote

Other industries