Skip to content
Akros Mimarlık
TR

Trade fair

ORGATEC exhibition stands

The Cemer Kent Ekipmanları stand: a spherical climbing unit set on sand, a world-map brand wall behind it and meeting tables in front.

At ORGATEC the product is the furniture itself; visitors sit in the chair, raise the desk and step into the acoustic pod. The stand's job is to stay out of the product's way and give it a real office floor. We do that with a seamless floor finish, neutral walls and lighting that does not distort the product. The stand is produced in our workshop in Beylikdüzü, sent to Cologne by lorry under an ATA Carnet with customs handled by us, and built at Koelnmesse by our own crew.

What we do for you at ORGATEC

The fair takes place at Koelnmesse, which has 11 halls and 284,000 square metres of covered space. Our Aachen office is close to Cologne; the German-language correspondence with the hall management, the crew access and the on-site support are run from there. The technical file, the electricity and rigging applications, the graphics and the print are ours; freight is part of our exhibition logistics service. Your furniture is planned on the same lorry, travelling out and back with the stand.

On an office furniture stand we set the product up like an office: work area, meeting corner, lounge corner and acoustic pod as separate zones, each with its own lighting. If you show height-adjustable desks we run power to every desk; for acoustic pods we follow the hall's sound regulations. So that fabric and surface colours look right, the lighting is chosen with your product during the trial assembly at the workshop.

Stands we have built at this fair and in Cologne

Our ORGATEC project is not yet published on the site. In the same halls we work at imm cologne and interzum; our freight and build routine for Cologne comes from there. In Turkey we build stands for the Istanbul Furniture Fair, and our furniture industry page lists the work.

Which stand type

  • Custom timber build: 20 to 500 square metres, built in 2–5 days. The right type for a seamless floor and painted walls at a furniture fair; our first recommendation at ORGATEC.
  • Island and corner stands: from 36 square metres, built in 3–6 days. For brands that want the office layout visible from all four sides.
  • Double-decker stand: from 60 square metres, built in 4–8 days. For those who want the meeting rooms upstairs and the whole ground floor left to the product.

Timeline

ORGATEC runs from 27 to 30 October 2026. For this year's fair the 8-week start of the comfortable programme falls right about now; allowing for the freight week, the programme is design approval and the technical file to Cologne by 15 September, workshop production and print files on 29 September, the trial assembly and the loading of the lorry on 20 October. Build in the hall during fair week, the handover walk on 26 October and dismantling on the evening of 30 October. Put your floor area and the product groups you plan to show into the quote form; we reply within 48 hours.

ORGATEC 2026: 27–30 October 2026, Koelnmesse, Cologne. 6 weeks to go. Official fair site

Preparation timeline

  1. 1 September 20268 weeks before

    Brief, floor plan and three-dimensional design visual

  2. 15 September 20266 weeks before

    Design approval, technical file submitted to the organiser

  3. 29 September 20264 weeks before

    Production in the workshop; graphics and print files

  4. 20 October 20261 weeks before

    Trial assembly in the workshop, dispatch, ATA Carnet for abroad

  5. 27 October 2026Fair week

    Hall build, handover the day before opening, dismantling at close

Our stand types: size and on-site build time

We produce all of them in our own workshop. The size range and on-site build time come from our recorded projects; if you are undecided we draw two types for the same floor area and show them side by side.

  • Custom Timber Build
    Size
    20500
    Build
    2–5 days on site
    Projects
    13 published projects

    Purpose-built timber stand produced from scratch for each show.

  • Maxima System
    Size
    12200
    Build
    1–3 days on site
    Projects
    18 published projects

    Aluminium profile frame with clad panels; fast to install.

  • Modular
    Size
    9150
    Build
    1–2 days on site

    Component system built from aluminium profiles and panels; quick build and a small shipping volume.

  • Double Decker
    Size
    60600
    Build
    4–8 days on site

    Meeting space on the upper level; two floors on the same footprint.

  • Island and Corner
    Size
    36800
    Build
    3–6 days on site

    Open on all four sides; approachable from every direction.

  • Country Pavilion
    Size
    1002000
    Build
    4–10 days on site

    Shared area for many exhibitors with individual booths and one welcome desk.

Stands we have built

We have not published a project under this heading yet; these three stands from other fairs show the work of our workshop.

All projects

Frequently asked

When and where is ORGATEC 2026?
ORGATEC 2026 takes place 27–30 October 2026 at Koelnmesse (Cologne). Dates come from the organiser’s official site; this page is updated if they change.
When should a stand for ORGATEC 2026 be ordered?
Starting by 1 September 2026 for a custom timber stand, or around 29 September 2026 for a maxima system stand, gives a comfortable schedule. For later starts we first tell you what can still be done.
What should we send for a quote?
The fair name and dates (filled in from this page), your floor area and number of open sides, plus a floor plan and reference images if you have them. The first concept and a written budget frame arrive within a few working days; the concept is free of charge.
Do you transport our furniture together with the stand?
Yes. The stand and the furniture leave on the same lorry under an ATA Carnet, travel to Cologne and return on the same carnet after the fair. The papers for the furniture stay on your side, and we list together which document has to be ready when.
Can you run power to every height-adjustable desk?
We can. The number and position of the desks are set in the plan, a cable duct runs under the floor and we file the electricity application for the total load in the technical file.
Who builds the stand in Germany?
Our own crew travelling from Turkey; with the Aachen office close to Cologne, on-site support is quick. A custom timber build takes 2–5 days in the hall; we place the furniture together with you during the handover walk and hand over with a written guarantee.
What does Koelnmesse require for acoustic pods and closed rooms?
We follow the hall regulations for you. Closed volumes, ceilings and the height limit are drawn in the technical file by us and sent to the hall management. We pass the approval on when it arrives.

Let us build your stand at ORGATEC 2026

The link opens a quote form with the fair name and dates filled in; add your floor area and stand type and send it.

Request a quote

Other trade fairs