
EvafoneTechnology
Evafone 2026 Istanbul exhibition stand
12 m²2026IstanbulPetzoo Eurasia
Industry
On a machinery stand the sequence matters: the machine enters the hall first and the stand is built around it. We draw the plan that way round. The footprint, weight and service clearance of the machine are the first things on the drawing; walls, meeting area and graphics fit into what is left. If the machine will run during the fair, the power circuit, compressed air and, where needed, the chip extraction connection are written into the technical file from the start.
We draw the stand, produce it in our own workshop in Beylikdüzü, build it in the hall with our own crew and take it down when the fair closes. The machine’s entry, its weight and the power and air needs go into the technical file; the correspondence with the hall management is ours. Your machine is set in place on the first build day, the stand closes around it from day two, and on the last day your technicians start it up. For fairs abroad we run the freight, the ATA Carnet and customs; for Germany our Aachen office gives local support on the German side.
A stand is easily crushed next to a large machine. We balance the wall height against the machine, draw the brand wall high enough to be read from the aisle and move the meeting area to the corner furthest from the noise.
Our two large jobs in this sector are in Germany. In 2025 we built the 182 square metre maxima stand for Emintosun at LIGNA in Hanover and, the same year, the 153 square metre maxima stand for GMS at bauma in Munich; the photographs of both are on their project pages. LIGNA is next on 10–14 May 2027 and bauma on 3–9 April 2028. In Turkey we work at Tüyap for WIN EURASIA and MAKTEK Eurasia; the stands we have built at HANNOVER MESSE are on the machinery and industry page.
Send the fair name and dates, your floor area, the number of open sides and the dimensions and weights of the machines you will bring; we reply within 48 hours. The first concept is free and three-dimensional; the written budget frame has three options with the scope listed item by item. A comfortable schedule starts 8 weeks before the fair: design approval and technical file at 6 weeks, workshop production at 4 weeks, trial assembly at 1 week. The quote form is here.
We produce all of them in our own workshop. The size range and on-site build time come from our recorded projects; if you are undecided we draw two types for the same floor area and show them side by side.
Purpose-built timber stand produced from scratch for each show.
Aluminium profile frame with clad panels; fast to install.
Component system built from aluminium profiles and panels; quick build and a small shipping volume.
Meeting space on the upper level; two floors on the same footprint.
Open on all four sides; approachable from every direction.
Shared area for many exhibitors with individual booths and one welcome desk.
We have not published a project under this heading yet; these three stands from other fairs show the work of our workshop.

EvafoneTechnology
12 m²2026IstanbulPetzoo Eurasia

Er BakırMining
54 m²2025AtlantaInterwire

Yeniler EtiketPackaging
100 m²2025IstanbulEurasia Packaging Istanbul
Send the fair name, dates and your floor area; the first concept and a written budget frame arrive within a few working days. The concept is free of charge.
Request a quote