Skip to content
Akros Mimarlık
TR

Location

Exhibition stand builder in Milan

Taking a stand to Milan means standing next to Italian and European competitors who are used to well-made things. We do this from Istanbul: the stand is produced in our workshop in Beylikdüzü, trucked to Italy and built at Fiera Milano by the crew that made it. What is left on your side is bringing the products and standing in front of the stand on the opening morning.

What we do at Milan fairs

Fiera Milano, with 8 halls and 345,000 square metres, is one of the largest venues we work in, and we follow two of its fairs. Salone del Mobile.Milano runs on 13–18 April 2027; for a furniture manufacturer the stand itself has to be finished like a piece of furniture, because visitors judge the edge of the stand with the same eye they use on the product. For this fair we suggest custom timber with uninterrupted surfaces and careful lighting. EMO Milano runs on 4–8 October 2027; for a company bringing a machine tool we put the floor load, the power supply and the safety of a live demonstration into the plan first. The metal processing and machinery pages describe what we do on that kind of stand.

We do not yet have a published project page from Milan. For our work in Europe, see the 100 square metre İba Kimya stand at PaintExpo 2024 in Karlsruhe and the 60 square metre maxima stand for Ağaoğlu Silah at IWA 2025 in Nuremberg. Freight, customs and build-up follow the same routine in Italy.

Freight, customs and local support

The stand leaves the workshop after a trial assembly and a lighting test, packed in labelled crates on a truck bound for Italy. Temporary export from Turkey and temporary import into Italy run on an ATA Carnet that we issue and follow through customs; after the fair the dismantled stand returns on the same carnet. We fill in the Fiera Milano technical file, the electricity order and, where needed, the height and rigging application. The truck leaves one week before the fair and its arrival is planned around the delivery slot of your hall. The exhibition logistics page walks through the process step by step.

Which stand type for Milan

  • Custom timber build: our first suggestion for Salone del Mobile; uninterrupted surfaces, free dimensions, workshop production, 2–5 days of build-up in the hall.
  • Maxima system: aluminium grid with printed panels, built in 1–3 days; on a machine-heavy stand such as EMO it is often enough for the perimeter walls.
  • Island and corner stands: on plots with several open sides we place the product to face the aisle.

Send the fair name and dates, your floor area and the number of open sides through the quote form; within 48 hours you receive a free first concept and a written budget in three options.

Fair venues in Milan

  • Fiera Milano
    Halls
    8 halls
    Area
    345,000
    Fairs in calendar
    2 fairs in calendar

    Akros Mimarlık builds turnkey exhibition stands at Fiera Milano, produced in its Istanbul workshop and shipped to the halls at Rho with customs included. One contract covers Salone del Mobile and EMO Milan, freight and ATA Carnet included; our own crew builds and dismantles. The first concept is free and the written budget comes in three options.

Upcoming fairs in Milan

Full fair calendar

Dates come from the organisers’ official sites; past fairs drop off the list. The link on each row opens a quote form with the fair name and dates filled in.

April 2027

October 2027

Working timeline for a fair in Milan

  1. 8 weeks before

    Brief, floor plan and three-dimensional design visual

  2. 6 weeks before

    Design approval, technical file submitted to the organiser

  3. 4 weeks before

    Production in the workshop; graphics and print files

  4. 1 week before

    Trial assembly in the workshop, freight, ATA Carnet and customs

  5. Fair week

    Hall build, handover the day before opening, dismantling at close

What determines the price

Our quote lists the scope item by item; we take a brief before quoting, because two stands of the same size can differ a lot.

  • Floor area and the number of open sides
  • Stand type: custom timber or maxima system
  • Height, suspended ceiling and rigging needs
  • Fittings such as lighting, screens and furniture
  • Venue rules and build hours
  • Freight distance and customs
What goes into exhibition stand pricing

Logistics note

For installations abroad, freight, ATA Carnet and customs are handled by Akros; the stand is produced in the Istanbul workshop and shipped to the hall.

Our stand types: size and on-site build time

We produce all of them in our own workshop. The size range and on-site build time come from our recorded projects; if you are undecided we draw two types for the same floor area and show them side by side.

  • Custom Timber Build
    Size
    20500
    Build
    2–5 days on site
    Projects
    13 published projects

    Purpose-built timber stand produced from scratch for each show.

  • Maxima System
    Size
    12200
    Build
    1–3 days on site
    Projects
    18 published projects

    Aluminium profile frame with clad panels; fast to install.

  • Modular
    Size
    9150
    Build
    1–2 days on site

    Component system built from aluminium profiles and panels; quick build and a small shipping volume.

  • Double Decker
    Size
    60600
    Build
    4–8 days on site

    Meeting space on the upper level; two floors on the same footprint.

  • Island and Corner
    Size
    36800
    Build
    3–6 days on site

    Open on all four sides; approachable from every direction.

  • Country Pavilion
    Size
    1002000
    Build
    4–10 days on site

    Shared area for many exhibitors with individual booths and one welcome desk.

Stands we have built

We have not published a project under this heading yet; these three stands from other fairs show the work of our workshop.

All projects

Frequently asked

Do you build at the fair venues in Milan?
Yes: Fiera Milano. Hall rules vary by fair; we submit the technical file to the organiser.
When should a stand for Milan be ordered?
At least eight weeks before the fair for a custom timber stand, four weeks for a maxima system stand; for builds abroad we add a week for freight and customs.
What determines the price?
Floor area, stand type, number of open sides, height, fittings and venue rules. The quote lists the scope item by item; we take a brief before quoting.
Can we get a quote for the upcoming fairs in Milan?
Yes. The link next to each fair in the calendar opens a quote form with the fair name and dates already filled in; add the floor area and stand type and send it.
When does the truck leave for Italy, and can our products travel with it?
The truck leaves Beylikdüzü one week before the fair. If you want your products on the same truck you send us the parts list and we add it to the carnet; for heavy or bulky items we plan the crates and the loading around them.
Who deals with a problem at customs?
We do. The team that issues the ATA Carnet and follows the exit from Turkey and the entry into Italy is ours, so if something is queried at the border you are not the one making the calls from Istanbul.
Who builds and dismantles the stand at Fiera Milano?
The crew that produced it in our workshop. Build-up and dismantling hours come from the organiser's and Fiera Milano's documents; we walk the stand with you the day before opening and hand it over in writing.
Do we need to speak Italian in the hall?
No. We handle the correspondence with the organiser and the venue, and during build-up week our crew on site speaks with you in Turkish or English.

Let us build your stand at your fair in Milan

Send the fair name, dates and your floor area; the first concept and a written budget frame arrive within a few working days. The concept is free of charge.

Request a quote

Other cities and countries